Farm Root Cellar Expenses
| 1. Excavation |
|
| Road and pad |
2,250 |
| Basement |
2,785 |
| Total
Excavation |
5,335 |
|
|
| 2. Concrete
Drains |
|
| Miscellaneous
pipes, etc. |
725 |
| Walls and slab |
8,340 |
| Total
Concrete |
9,155 |
|
|
| 3. Temperature
Control System |
|
| Computer technology |
111 |
| Computer technology
installation |
3,150 |
| Total
Temperature Control |
3,261 |
|
|
| 4. Construction |
|
| Labor |
6,000 |
| Electrical labor |
1,240 |
| Materials |
10,581 |
| Total
Construction |
17,847
|
|
|
| Grand
Total |
$35,598 |